The two measurements we set up are formulated so that their terminal values are of interest. To review terminal values we will use the Table tool. Set the Time Axis tab of the Control Panel to use only a very small range (see Time Axis control in the Reference Guide). Clicking on the Table tool generates:
If you have more than one run loaded you will probably see some blank lines since these variables do not appear in the other models.
The project cost $8.85 million and was completed at time 10.75.